Products and services using Hydrogen energy storage & transport are generally available around 2022
Grader A: partial
Grader B: partial
agrees with A, without seeing its verdict
Audit: confirmed
in the fixed audit sample (D11)
Published: partial
Grader A: partial
Power-to-gas has run as kW-to-MW pilots since 2012 (Falkenhagen, Frankfurt, Mainz) plus one industry-scale plant (Audi e-gas Werlte, 6 MW); gigawatt-scale projects are planned for 2028+. Hydrogen-for-energy networks exist only as demonstrations and blends. Real but limited.
Test: D37 Horizons: hydrogen storage-and-transport energy services available to ordinary customers outside pilots by 2024; demonstrations or a few plants are partial.
Grader B: partial
Hydrogen storage and transport exist as industrial supply (pipelines, salt caverns), and power-to-gas plants and grid blending ran as pilots (Energiepark Mainz 2015, HyDeploy 2019). No hydrogen grid replaces electricity transmission. Real but limited.
Test: Hydrogen energy storage/transport services could be bought outside pilots by 2024; partial if pilots/limited or by 2025-2027.